Clean Water Treat Plant Design and Construction 500 lps Capacity, Moya Cikarang
SPAM Durolis Riau Province WTP 400 lps Capacity
WTP II Ex. Itali Rehabilitation and Capacity Uprating from 500 lps to 1000 lps and 10.000 m³ Capacity Reservoir
PT. Pertamina RU IV Cilacap Water Treatment Plant (WTP) Installation Unit Construction 4000 Capacity m³/day
Intake Building Upgrade Construction, Water Treatment Plant Installation Construction 250 m3/hour Capacity and Reservoir at KEK Sei Mangkei PTPN III
Potable Water Storage Tank Relocation and CAF Tank Revitalization Design and Build 30 lps Capacity
Line 2 WTP Perumahan PT. Jababeka Cikarang Clarifier Rehabilitation 880 lps Total Capacity